Wednesday, June 6, 2018

Day 25-26 Trimming Hurricane Hinge and Installing Luan

Day 25 was a hot afternoon and Dan had a long day at work so we figured out the workings and how to install the door latch and then trimmed our hurricane hinge correctly and drilled holes in the flat bar. Contrary to my prior thought of the 3/8" offset of the galley hatch door, it needs to be more like 1/4". The flat bar was cut so it will sit up against the aluminum molding trim and the other vertical "foot" was trimmed down to match as well. The picture below is how it will be installed.


Total time spent Day 25: 1 hour
Total project hours: 95 hours

Day 26 I finished the interior cabinets (after messing it up AGAIN and installing it backwards 🙄🙄) and NOW it finally is finished.


I used the orbital sander and sanded the galley hatch frame so everything is smooth for when we skin it with the Luan and aluminum.

That took most of the afternoon and when Dan got home we cut more of the radiant barrier insulation and installed two layers between the spar on top of the interior roof.

We purchased a Brad nailer and decided to skin the teardrop with our first layer of Luan (1/8" plywood). No pictures of this part because it took both of us plus our roommate to get it done.


Since our trailer is only 4 foot wide, we decided to bend our luan the long ways so we only needed one sheet to cover from the back where the hatch attaches to the front. We started in the back with everything clamped and released the back clamps on the spar where the hurricane hinge will be and covered about 12 inches back with polyurethane glue. Then, we clamped it back down and use the brad nailer to put in about 15 nails on each spar and along the sidewalls. Then we moved forward and put polyurethane glue along the entire top and then took turns using the Brad nailer to secure the top and then we did the front curve and bent it slowly so the wood wouldn't crack. Once we put a bunch or nails in, it hit us that we FORGOT about all our wiring. 🤦🏻‍♀️🤦🏻‍♀️

We figured with all the nails that we had hit the wiring and there was no way to check it so we got a tip from a friend (shoutout to all_i_do_is_hobby on IG) to put in 1-3.5 amp fuses in and connect everything to see if the circuit had shorted. Nothing blew and we measured the current and every wire still showed 12.7v so I think we're okay!! But we probably have nails through our wires...


During that time I got the spar urethane layer on the galley counters to protect them and now all we need is cabinets on the bottom and the galley interior will be finished!


Dan tested all the wiring for the fan, solar, and 12v outlet and none of them shorted. Thank goodness. We really wouldn't have any good way to fix it if it had and that would have been many hours down the drain. Big lessons learned today.


Our interior reading lights have a blue light setting. Cute.


Dome light works and is surprisingly bright! It will work really well as a game light. We will be installing a pull out table under the lower shelf.


We finally have the first roof layer on! It's looking real now! We've passed most of the hard busy work and now it's on to finishing and securing the electrical in the tongue box. We are going to cut a layer of the Luan to install on the front with a hole for the wiring. We figured that would be easier than cutting it in a giant 8 foot sheet of the Luan. We are going to source our aluminum from Wrisco I believe and hopefully get that on Thursday! We've also broken the 100 hour mark!


Total time spent Day 26: 7 hours
Total project hours: 102 hours